Construction (including delivery and commissioning) of the measuring and reduction station (container type) at MONTMONTAŽA-OPREMA Ltd. workshop.
Construction of hot water pipeline for „Južna Dubrava“ thermal power plant in Zagreb; Section 3, phase 3 (DN 500/670, route length = 790 m).
Engineering construction works on storage tanks (2 x 80.000 m3) at oil terminal „Omišalj – Krk“, for investor JANAF JSC (2018).